Daimler-Benz has decided to switch its engine production facility in Jawor, Poland, to a fully CO2-neutral energy supply. Following the motto “the best or nothing”, we are very pleased to be able to make our contribution to emission-free vehicle production. The two industrial pellet boiler systems of 1.5 MW and 5 MW, equipped with our AGRO Turbo Challenger® and Efficiency Booster, started operation this week.
An AGRO steam system between the bathing lake and the FIS ski jump heated with waste wood
Titisee-Neustadt, nestled in the beautiful nature of the Black Forest, has many attractions to offer. Not only the Titisee itself, the largest