Technology used: AGRO dust firing with horizontal heat exchanger Fuel: dust-containing waste from strip production Capacity: 5 MWt Year of construction: 2017

Bioenergie Berchtesgadenerland GmbH
Year of construction 2010 | 7 MWt, 1.3 MWe and 6 MWt | AGRO thermal oil boiler system and warm water system with flue gas condensation
